Greater Tulsa Area Classifieds Moderated Newsgroup   >   Broken Arrow 
   >   Children 
   >   Clothing 
    >    3MM green snap-in panel mount leds - long leads  
3MM green snap-in panel mount leds - long leads
  (15) Green 3mm Snap-In Panel Mount LEDs
  Typical current: 10 - 20 mA. Max current: 30 mA. VF: 2.1 VDC.
  Leads are 26 AWG, 6" long and pre-tinned ½ inch.
Typical current limiting resistors ( NOT included ) are 150 Ω for 5 VDC and 470 Ω for 12 VDC operation.
Assembly mounts in 1/16" thick panel with a 0.155" (4mm) diameter hole.
Datasheet - Dialight 558-1501-003 (129K PDF)
Be sure to add us to your Favorites List !
etronic e-tronic hamtronic qba tech
14 day Non-DOA, Good-on-Arrival Guarantee
Untested, but NO JUNK or suspect parts
PCB parts are thru-hole, NO SMD/SMT
Manufacturers may vary from picture
Pay by Postal Money Order REQUIRED.